The Process
Once you decide to go ahead with Exclusive Pools we will arrange for structural engineers drawings to be done for your pool and submit these plans to the relevent authories including Shire & Water.
The approval process can take anywhere from one to six weeks. This is a good time to organise your fencing, paving and confirm your colour selections for the tiles and interior of your pool.
When all the approvals are received we will arrange excavation. The pool will be pegged out by our Supervisor so that you can check the shape and the hole is dug the next day.
The next stage is forming the pool and set up of the steel reinforcing bars. The pool shell will then be 'sprayed' with concrete.
The waterline tiles, header course and plumbing are then installed and the pool backfilled.
The final stage is plastering of your pool and installation of the filtration equipment. The filling of the pool is usually done on the day of plastering, so it is important that the fencing is up before the internal finish is started.
Exclusive Pools will then clean and balance your pool and complete a handover with you ensuring that you are happy with the operation of the equipment.
|